易搜题 > 资格证大类 > 软件考试 > 问题详情
问题详情

Many of the activities performed during the preliminary investigation are still being conducted in( ), but in much greater depth than before. During this phase, the analyst must become fully aware of the ( )and must develop enough knowledge about the ( ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the (4)for process and data of current system, the deliverable from this phase also includes the( )for the proposed system.
(4)应选( )。

A.logical moD.els
B. physical moD.els
C. D.esign moD.els
D.. implementation moD.els

未找到的试题在搜索页框底部可快速提交,在会员中心"提交的题"查看可解决状态。 收藏该题
查看答案

相关问题推荐

  • 计算机系统性能评价技术是按照一定步骤,选用一定的度量项目,通过建模和实验,对计算机的性能进行测试并对测试结果作出解释的技术。计算机系统工作能力的常用评价指标主要有三类,下面()不属于这三类指标。
    A.系统响应时间
    B.系统吞吐率
    C.资源利用率
    D.系统输出率
  • ()的目的是评价项目产品,以确定其对使用意图的适合性,表明产品是否满足规范说明并遵从标准。
    A.IT审计
    B.技术评审
    C.管理评审
    D.走查
  • 阅读下列说明,回答问题l至问题4,将答案填入答题纸的对应栏内。【说明】某信息系统集成公司,根据市场需要从2013年初开始进入信息系统运营服务领域。公司为了加强管理,提高运营服务能力,企业通过了GB/T24405.l-2009idtIS020000-1:2005认证。2013年12月该公司与政府部门就某智能交通管理信息系统运营签订了一份商业合同,并附有一份《服务级别协议》(SLA),该级别协议部分内容如下:(1)系统运维要求内容:检查、维修、监控服务等级:7×24小时服务可用性要求:全年累计中断不超过20分钟(2)服务器维修数量:1台内容:检查、维修、监控服务等级:7×24小时此外,对一些网络设施维护等也进行了规定。公司为了确保该项目达到SLA要求,任命了有运维经验的小王为项目经理,并在运维现场建立了备件库、服务台,配备了3名一线运维工程师3班轮流驻场服务。公司要求运维团队要充分利用这些资源,争取服务级别达成率不低于95%,满意度不低于95%。项目进入实施阶段后,小王根据企业和客户要求,建立了运维实施程序和运维方案,为了完成SLA和公司下达的指标,小王建立了严格的监督管理机制,利用企业的打卡系统,把运维人员也纳入打卡考核。但在第一个季度报告时,客户就指出,系统经常中断、打服务电话也经常没人接,满意度调查结果也只有65%。
    【问题1】(8分)服务报告管理流程须确保供方应通过及时、准确、可靠的报告与需方建立有效的信息沟通,为双方管理层提供决策支持。在IT服务运营中服务报告管理应注意哪些注意事项?【问题2】(9分)第一季度报告,客户满意度低的原因有哪些?【问题3】(8分)在(1)~(4)中填写恰当内容(从候选答案中选择一个正确选项,将该选项编号填入答题纸对应栏内)。客户接受运维服务季度报告的过程属于范围(1)。满意度调查属于质量(2)。运维企业管理要符合《信息技术服务运行维护第1部分通用要求》,除了要加强人员、资源、流程管理外,还要强化(3)管理。服务台属于(4)。(1)~(2)供选择的答案:
    A.控制B.确认C.评审D.审计(3)~(4)供选择的答案:
    A.知识库B.流程工具C.技术D.资源
  • The term computer describes a device made up of a combination of electronic components.By itself, a computer has no (请作答此空) and is referred to as hardware, which means simply the physical equipment. The hardware can't be used until it is connected to other elements, all of which constitute the six parts of a computer-based information system,hardware,software,data/information, people, procedures and communications.A system is defined as a collection of related components that ( ) to perform a task in order to accomplish a goal. Any organization that uses information technology will have a computer-based information system to provide managers (and various categories of employees with the appropriate kind of information to help them make decisions.Systems analysis and design is to ascertain how a system works and then take steps to make it () Often, a system approach is used to define, describe, and solve a problem or to meet a(an)()From time to time, organizations need to ( )their information systems, in, responseto new marketing' opportunities, modified government regulations, the introduction .of new technology, merger with another company, or other developments. When change is needed, the time is ripe for applying the principles of systems analysis and design.
    A.information
    B.software
    C.intelligence
    D.Data
  • IT服务部署实施计划阶段的主要活动包括:计划沟通、计划制定、计划评估确认与计划修订。“通过与服务团队负责人交流,了解其服务支持和提供的能力,以确保为其计划培训时间、培训内容、同时依据其服务能力定义合理的服务目标和实施里程碑”应属于()活动。
    A.计划沟通
    B.计划制定
    C.计划评估确认
    D.计划修订