银行港币境外付款当日起息截止时间为上午10时30分。
A、对
B、错
相关问题推荐
-
人工定额是指在正常的施工技术和组织条件下完成单位合格产品所必需的人工()标准。
A、施工
B、使用
C、消耗量
D、含量
-
A产品有三个生产步骤加工完成,采用逐步结转分步法计算成本。本月第一生产步骤转入第二生产步骤的生产费用为2300元,第二生产步骤转入第三生产步骤的生产费用为4100元。本月第三生产步骤发生的费用为2500元(不包括上一生产步骤转入的费用),第三步骤月初在产品费用为800元,月末在产品费用为600元,本月该种产品的产成品成本为()元。
A、10900
B、6800
C、6400
D、2700
-
A developer is creating a class Book, that needs to access class Paper. The Paper class is deployed in a JAR named myLib.jar. Which three, taken independently, will allow the developer to use the Paper class while compiling the Book class?()
AThe JAR file is located at $JAVA_HOME/jre/classes/myLib.jar.
BThe JAR file is located at $JAVA_HOME/jre/lib/ext/myLib.jar..
CThe JAR file is located at /foo/myLib.jar and a classpath environment variable is set that includes /foo/myLib.jar/Paper.class.
DThe JAR file is located at /foo/myLib.jar and a classpath environment variable is set that includes /foo/myLib.jar.
EThe JAR file is located at /foo/myLib.jar and the Book class is compiled using javac -cp /foo/myLib.jar/Paper Book.java.
FThe JAR file is located at /foo/myLib.jar and the Book class is compiled using javac -d /foo/myLib.jar Book.java
GThe JAR file is located at /foo/myLib.jar and the Book class is compiled using javac -classpath /foo/myLib.jar Book.java
-
分部工程验收时,各方分别签字的质量证明文件在验收后3天内,应由( )报送质量监督机构备案。
A、建设单位
B、监理单位
C、施工单位
D、设计单位
-
下列各成本中属于总可变成本TVC的是()
A、厂房
B、机器设备
C、工人工资
D、折旧费