易搜题 > 资格证大类 > 计算机编程 > 问题详情
问题详情

A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()

A、Implement PowerHA SystemMirror on both VIO servers.

B、Configure Etherchannel between the client LPARs and the two VIO servers.

C、Configure Network Interface Backup between the two VIO servers and use each VIO server to access the network.

D、Implement Shared Ethernet Adapter failover and have all client partitions access the network through the shared adapters.

未找到的试题在搜索页框底部可快速提交,在会员中心"提交的题"查看可解决状态。 收藏该题
查看答案

相关问题推荐

  • 话务量为0.02Erl,其含义是()。

    A、一个信道每小时被占用1.2分钟

    B、一个信道每小时被占用2分钟

    C、一个信道每小时被占用1.5分钟

    D、一个信道每小时被占用15分钟

  • ()是由项目经理造成的项目管理问题。

    A、货物产地

    B、重要货物来源记录

    C、货物运输方式

    D、同类货物价格

    E、对市场的分析、预测

  • Which interface tunnel parameter allows an LSP to use a specified explicit route?()

    A、path-option

    B、route-option

    C、explicit-path-option

    D、explicit-route-option

  • 某基站应用跳频功能,主BCCH不参与跳频,小区HSN相同,因工程师设置错误导致两个TRX的MAIO相同,则()

    A、RACH译码成功率正常;

    B、切入失败率可能会较高;

    C、SD立即指配成功率不正常

    D、该问题无法通过路测定位

  • What is the maximum suppress time for a dampened route, by default?()

    A、5 minutes

    B、30 minutes

    C、60 minutes

    D、90 minutes

联系客服 会员中心
TOP